289 Sports > Football > Real Madrid pays Hesse s 50 million liquidated damages in three phases
Real Madrid pays Hesse s 50 million liquidated damages in three phases
Romano was the first to reveal that the new star Hesse and Real Madrid are about to sign. Athletics online reporter Ornstein followed up and said that Real Madrid has activated the termination clause in the contract between Hessen and Bournemouth. Hesse agent is in Madrid, negotiating players and personal terms with Real Madrid, including the signing period, and the negotiations have entered a later stage. The termination fee of Hesse is 50 million pounds and can be paid in three installments. Real Madrid decided to activate it and reached a pre-decessor with the Cherry Legion. Real Madrid hopes that Hesse will compete with the team in the New World Club Cup that will start next month in the United States. Hessen joined Bournemouth from Juventus in the summer of 2024 with a transfer fee of 15 million euros. In the first season, he played 34 games for Cherry and contributed 3 goals.

Related Posts
A haircut is far away from Manchester United s long-haired man: I m really surprised that Amorin didn t change the formation when he played more than one player.
FootballOn November 25th, Manchester United lost 0-1 at home to ten-man Everton. After the game, Manchester United's long-haired brother Frank Ilett, who is known as "Manchester United won't win five consecutive games without a haircut", c...
【Football】
moreIn this round of Eredivisie, Robin van Persie promoted his 19-year-old son Shaquille to Feyenoord’s first team roster
FootballNovember 25 According to the Daily Mail report, Van Persie promoted his son Shaquille Van Persie to the first team roster in this round of the Eredivisie. In the 13th round of the Eredivisie, Feyenoord lost 2-4 to Nijmegen and suffered three consecu...
【Football】
moreLa Liga s latest points battle report, a fierce grab for 5! The Spaniard stopped the losing streak, caught up with Betis and still ranked 6th
FootballIn the early morning of November 25, the 13th round of the 2025-26 La Liga season ended with the final game, and the Spaniard faced Sevilla at the RCDE Stadium. After 90 minutes of fierce battle, the Spaniard defeated Sevilla 2:1 at home. The top fo...
【Football】
more
Hot Posts
- According to the latest FIFA rankings, the national football team ranks 93rd, and Italy falls out of the top 10
- Manchester United Financial Report 2: Cash flow is almost exhausted + debt interest is rising, results are life-saving straw
- Carragher: Lajue repeats his mistake, Tenghahe is the first to protect the "Lin"
- Falk: Liverpool, Real Madrid, Manchester United, Paris is interested in signing Upamecano without a sign tomorrow summer
- The French club with the most competitions in the European competition: Paris ranked first in 294 games, Lyon second in the
- 4: 4! 8 goals in halftime, 2 goals and 1 assist, Juventus scored 2 goals in a row in stoppage time, tied Dortmund in 96 minutes
- La Liga Comprehensive: Mbappe passes and shoots Real Madrid leads
- 40-year-old Ronaldo shows his power: Heavy shooting world wave, live perspective, too silky
- In a game, Real Madrid welcomes the strongest center! Mbappe has 3 goals in 2 La Liga games, Alonso is happy
- Leipzig after the game: Apologize to the fans, 0-6 is too bad, absolutely not to collapse like this
Recent Posts
-
The "Dragon Slayer" boy who defeated Liverpool, his parents gave up all support for him when he was eight years old
-
Nine Yin White Bone Claw Coutinho touched his head and killed him, his opponent covered his face and rolled, both of them were sent off by red
-
Barcelona s 2.5 million new stars may leave the team, will the repurchase clause become the last line of defense?
-
Wang Shuang scored and slid to celebrate with a goal! Wuhan Women s Football Team led Ho Chi Minh City Women s Football Team 1-0!
-
36.5 million euros were introduced! Italian media: Juventus asked Gonzalez to start at 25 million, he would not go to Saudi Arabia
-
Want to catch a mole again? Alonso imitates Mourinho, Real Madrid is about to be shaken
-
A big victory in the league raises confidence, Shenhua fights Ulsan with all his strength
-
Abanglaho: Risalison is not good enough, he might as well work with us as a commentator
-
Munoz: Actually, today we have the chance to kill the game earlier, Jiang Zhipeng has muscle strain and is short of
-
Bild: Guardiola is dissatisfied with Echeverri’s development in the pharmaceutical factory and may rent him back to River Plate in the winter window